Early Build Team - Sequence - 2025

We have a big build team this year so we're going to split into three groups!


Leonardos Donatellos Michaelangelos
Arrival Wait for placement Wait for placement Make breakfast
After Placement

Survey and mark locations for Peik deliveries.Deliveries



Measure and flag for Tool Fort, Bike Fort, Pillow Fort

 

Call Peik.Peik 775-674-9207

Survey for Empire Deliveries

 

Measure and mark fire lane,lane. thenThen flag locations for fireEmpire lane-adjacentFort, deliveries.Moving Truck, Water, Shower, and Generator.


Call for Empire (828-406-5099),5099

Water,

Sierra Site Svcs 888-458-8777 

Generator World 916-668-0605


After Deliveries  First six tarps Follow Leonardos building sticks for initial outpost Hang up and light Turtle Event sign

Follow Donatellos adding tarps to sticks
  Follow Michaelangelos to setup first 6 shiftpods Make dinner

personal setup and dinner

done for the night

personal setup and dinner

done for the night

personal setup and dinner

done for the night






Continue laying down tarps

Follow Leonardos building sticks

Pavillion

Measure and survey

 

Assemble mast on ground

 

When mast is assembled, all hands to raise it and secure guylines


Follow Donatellos adding tarps to sticks

Follow Leonardos setting up Shiftpods

Anchor all the sails and perfect


dinner and done for the night

dinner and done for the night

dinner and done for the night






Electrical grid 

Water setup 

Utility Lighting


Dining Room Furnishings

Lotus Belle Tent and its Furnishings

Lounge and Kink Fort Furnishings


dinner and done for the night

dinner and done for the night

dinner and done for the night






DJ / Audio Gear

Light whips and bike parking

Pillow Fort Setup


DMX Lighting